219 Engine

219 Engine 3 is a 1990 Pierce Lance, refurbished in 2007. Engine 3 capable of seating six
personnel with five MSA SCBA w/ spare cylinders. E-3 is equipped with a 1500
gpm single-stage Waterous Pump, a 500 gallon water tank, and a 430 Detroit Diesel.
E-3 has a hydraulic ladder rack that carries two pike poles and a full complement
of ground ladders including: a 24' Extension Ladder, 16' Roof Ladder, and a 10'
Attic Ladder. It also carries a Cutters Edge roof saw, ventilation fans, hand
tools, thermal imaging camera, and several portable extinguishers. The Engines complement of attack and supply hose includes: 1250' of five-inch
supply line, two 150 feet 1.75" minutman crosslays, one 200 foot 1.75" minuteman
crosslay, one 100 foot, 1.5" trashline, a 2.5" attack line with solid stream
nozzle, a 2.5" leader line w/ gated wye, 300' of 3" line for supporting standpipes
and sprinklers, a 100' 1.75" High Rise Pack and two lengths of hard suction for
drafting operations.

Above: Engine 3 before refurbish.
219 Engine Officer's Side Compartments
Above: Set of Irons (Haligan Bar/Flat Headed Axe, MSA 4500 PSI 30min SCBA, Haligan
Bar, K-Tool, Shove Knife, Utility Rope Bag

Above: Salvage Covers, PFD's, QRS First-In Bag, Portable Oxygen, Water for Rehab,
RIT (Rapid Intervention Team) Bag, Extension Cord Reel, Cheater (Electrical) Box,
Small Positive Pressure Ventilation Fan
219 Engine Rear Compartment

Above: Cutters Edge Ventilation Saw, Small Electric Smoke Ejector, Gas, Junction
Box, Hyrdrant Wrench
219 Engine Driver's Side Compartments

Above: Oil Dry, Flares, Cribbing, Foam Nozzel, Hyra-Ram, Sprinkler Kit, 100'
1.75" Highrise Pack, Standpipe Equipment Bag

Above: Spare Nozzel, 2 Distributing Nozzels, Gated Y's, Foam Eductor, Double
Male and Double Female Coupling Adapters, Strainer, Hose Straps
219 Engine Officer's Side Hydraulic Ladder Rack

24' Extension Ladder, 16' Roof Ladder, 10' Attic Laddder, 2 Pike Poles
|